top of page
aaa (3).png
INSTALL SOLAR PANELS ON ROOFTOP

Power
Your Home
with Solar Panels

Your choice between buying or financing depends on your financial goals, long-term plans, and energy needs. Let SMSolar guide you to the best option with a free consultation.

aaa (4).png

Why Solar Panels?

  1. Save electricity bills.

  2. Reduce your carbon footprint.

  3. Increase property value.

  4. Minimal maintenance required.

homepage.png

Why SMSolar ?

install solar panel.png
solution

Financial Benefits & Savings

cover web  (5).png

Our Latest Project

project bogor hybrid.png

Bogor

Hybrid Solar | 15.4 kWp 

Residential

  • HOW LONG TO INSTALL SOLAR PV SYSTEMS?
    Solar power system installations take around 2-5 days for residential scale projects. However, the entire process could take up to 1-2 months which includes procurement, testing, permitting, and reporting to PLN.
  • WHAT IS THE LIFTIME OF A SOLAR PV SYSTEM?
    SMSolar uses top-quality products allowing our solar PV systems to produce electricity for 25 years and more.
  • WHAT IS THE DIFFERENCE BETWEEN ON-GRID AND OFF-GRID SOLAR SYSTEMS?
    On-Grid System: Connected to the utility grid. Excess energy is exported to the grid (net metering). Relies on the grid for power when solar production is insufficient. Cost-effective but depends on grid availability. Off-Grid System: Operates independently without a connection to the utility grid. Requires batteries to store excess energy. Provides complete energy independence. Higher initial cost due to battery storage. Which one suits your needs depends on your energy goals and location!
  • WHAT IS A HYBRID SYSTEM?
    Hybrid systems can function as On-Grid or/and Off-Grid systems. These systems are connected to the grid and also utilize batteries. The batteries are mostly used as backup energy.
  • HOW MUCH MAINTENENCE IS REQUIRED FOR A SOLAR PV SYSTEM?
    Solar PV systems don't require a lot of maintenance. It mainly consists of washing/rinsing the panels during dry season to wash away any accumulated dusts that can block sunlight. To do the washing, you can use normal water solution.
  • HOW IS AFTER SALES AT SMSolar?
    Operation & Maintenance Warranty Training Monitoring Permitting
  • HOW TO MONITOR SOLAR POWER SYSTEM (PLTS) PRODUCTION RESULTS?
    Checking the production results of the Solar Power System (PLTS) can be done through a website or mobile app monitoring platform.
  • WHAT IS THE MAXIMUM POWER OUTPUT GENERATED BY SOLAR PANELS?
    The power output of solar panels follows PSH. Peak Sun Hour (PSH) refers to the maximum amount of sunlight hours. The average PSH in Indonesia is 3-4 hours.
  • PAYBACK IN HOW MANY YEARS?
    The payback period is 5 to 7 years.
  • WHICH AREAS DOES SMSolar COVER FOR THE INSTALLATION OF SOLAR POWER SYSTEMS (PLTS)?
    Installation services are available throughout Indonesia. For more detailed information about solar panel installation, feel free to contact us: Email : sales@smsolarindo.com Office : +62 251 8366 485 Whatsapp : +62 812 9261 1505
bottom of page